PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing sprinkler branches at the 4th floor Facing West.jpg Installing VAV boxes at the 3rd floor Facing East.jpg EPDM Roofing at the High Roof Facing East.jpg Installing EPDM at the High Roof Facing East.jpg Installing Waste and Vent piping at the 3rd floor bathrooms Facing South.jpg
Previous page Installing Waste and Vent piping at the 3rd floor bathrooms Facing South
Installing Waste and Vent piping at the 3rd floor bathrooms Facing South